FreightLens
Carrier performance, lane economics, and cost trends across 8 full-truckload lanes — built on a Python ETL pipeline (pandas → SQLite) with a SQL analysis layer.
Monthly cost per km and on-time performance, Jan–Dec 2025
On-time rate vs cost per km — the core trade-off in carrier allocation
Cost per tonne-km normalises lanes of different lengths and loads
| Lane | Shipments | Avg cost (₹) | ₹ / tonne-km | On-time | Avg delay |
|---|